Water Supply

Ensuring a fresh water supply for the Koffiefontein communities

Petra saw the need to include the refurbishment of an emergency water pipeline local to Koffiefontein as one of its Social and Labour Plan projects.

This vital work was concluded in April 2016 and meant that the pipeline was up and running shortly before the beginning of a year-long drought during 2016–2017, supplying much needed drinking water to the Oppermansgronde and Koffiefontein water filtration plants.